Shuttle Atlantis Poised at the Pad

Published: Wed Aug 2nd, 2006
Source: www.nasa.gov



Space Shuttle Atlantis' slow, 4.2-mile journey from the Vehicle Assembly Building to the pad began at 1:05 a.m.
Riding atop the mobile launch platform and carried by the crawler transporter, the orbiter is attached to its external tank, flanked by two solid rocket boosters.

At the pad, the vehicle will be enclosed by the rotating service structure during its preparation for launch. From there the payload for the mission will be loaded into the cargo bay. The launch window for this mission to resume construction of the International Space Station opens Aug. 27.

The STS-115 crew consists of Commander Brent W. Jett, Jr., Pilot Christopher J. Ferguson and Mission Specialists Heidemarie M. Stefanyshyn-Piper, Joseph R. Tanner, Daniel C. Burbank and Steven G. MacLean, who represents the Canadian Space Agency.

During their 11 days in space, the astronauts will install the integrated P3/P4 truss segment with its two large solar arrays that will provide one-fourth of the total power generation capability of the completed station.
--- ends ---

Recent News Articles

Friday, November 20, 2009
Wednesday, November 18, 2009
Tuesday, November 17, 2009
Monday, November 16, 2009
Sunday, November 15, 2009
Saturday, November 14, 2009
Thursday, November 12, 2009
Wednesday, November 11, 2009
Monday, November 9, 2009
Saturday, November 7, 2009
Thursday, November 5, 2009

» Older news articles

Back to the top All content © 2001 - 2009 Air-Attack.com, unless otherwise indicated. All Rights Reserved.
About us | Disclaimer | Privacy Policy | Contact Us | Sitemap | Links
Powered by Symfony Framework
AVIATION TOP 100 - www.avitop.comAvitop.com